The contract is for the operation, maintenance of electrical mechanical installations, and continuous monitoring of the CETP (capacity 12 MLD) at Lawrence Road Industrial Area, Delhi. The contract period is 6 months. The estimated cost is 2,94,73,**** must submit their offer through the e-tendering process. Performance guarantee of 5% of the estimated cost or tendered value (whichever is higher) is required. The work falls under essential service and cannot be stopped. Penalties are specified for non-operation, breakdown response, and non-compliance with discharge standards.
Monthly payments shall be released after certification by the engineer in charge based on: manpower deployment, plant performance, effluent quality, submission of reports, maintenance records, attendance records. monthly payments shall be released after certification by the engineer in charge
Equipment new repaired used in the work shall be under defect liability period of one year. all equipment newrepaired used in the work shall be under defect liability period of oneyear.
Tenderers must furnish an empanelment certificate issued by DSIIDC for CETP works. 1. 3. 1 empanelment certificate issued by dsiidc for cetp works
Penalties are imposed for failure to achieve discharge standards, short deployment of manpower, equipment downtime, and failure to submit reports. penalties shall be imposed for: failure to achieve discharge standards.
Tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting their tenders. tenderers are advised to inspect and examine the site and its surroundings and satisfythemselves before submitting their tenders as to the nature of the ground and subsoilso far as is practicable
Submitting false information or documents may lead to forfeiture of earnest money deposit and blacklisting. if any tenderer submits false information andor documents, his earnest money depositshall be forfeited and he shall also be blacklisted debarred by the corporation for futuretendering.
The estimated cost is 2,94,73,**** cost : 2, 94, 73, ****
The contractor must operate and maintain the CETP plants continuously 24x7 days to ensure uninterrupted treatment of effluent and compliance with applicable discharge standards. the contractor shall operate and maintain the cetp plants continuously 24 7 days to ensure uninterruptedtreatment of effluent and compliance with applicable discharge standards of dpcc.