The tender is for the operation and maintenance of sewerage and water supply schemes in Sangrur. Bidders must register on the e-procurement portal. The last date for online submission of bids is December 26, 2025. The tender validity is 120 days. Bidders must have PAN, GST, EPF, and ESI numbers. A security deposit will be deducted from each bill. The engineer in charge will assist the contractor for diverting the traffic with help of local police. The comparative statement shall be as per the quoted rates. The agency must submit documents along with dates and signatures. The work order will only be issued if the estimate of the work is technically vetted from the competent authority. The contractor will be responsible for all risks of loss or damage. The work order will be issued after obtaining necessary sanction if any from govt. EMD and tender form fee will be payable online. The contractor shall produce a certificate from the manufacturer that interlocking paver blocks for the specified/allotted work have been supplied by him and the grade of the paver blocks is per is 15658. The contractor must have his own core cutter machine for extraction of cores from the running work for sample checking. The contractor must have his own quality control laboratory equipped with requisite instruments and technical staff. All contracts with governments shall require registration of workers under the building and other construction workers act **** and extension of benefits to such workers under the act. The benefits under this act have to be extended to the registered workers within a stipulated time frame. The work order will only be issued if the estimate of the work is technically vetted from the competent authority agency/firms/coop societies/contractors registered with MSME also will have to deposit earnest money as per rules. The firm/agency/contractor/oem/supplier must be iso: **** certified , risk management system iso cerified and energy management system certified and other requrements of waste management . Certificates to be attached. The contractor will get comprehensive group insurance of all his workers under this contract. The cost of epf and insurance is included in dnit. The contractor will submit proof of the deposit of epf and insurance issued by concerned department at the time of submission of bill to the office. In case3 same is not deposited the further payment of bill will not be made to contractor till the same is deposited in office. The contractor will also take all precautions and preventive measures required to handle the machinery for operation of installation to ensure safety of its workmen and prevent accidents at the site. In case of any accident in spite of all protections taken by him, he shall be responsible for payment of compensation if any to the workmen and shall settle any/all other legal complications claims there at his own. The contractor will maintain service centres at suitable place in the town, with the consent with the concerned sde and space will be provided by the department free of cost. The complaints received through toll free numbers from m. c pwssb official also shall be incorporated. The contractor will disconnect the defaulters connection after getting information from the concerned sde. In case water supply sewerage scheme is taken over by the m. c then the pwssb is at liberty to tranfer the contract to m. c authorites no claim on this account shall be entertained. The work of bill generation of water supply and sewerage, distribution of bills and revenue connection shall remain in the scope of department. If during the maintenance it comes into the notice of the contract about the illegal connection then he will inform the concerned jesde immediately. If at any time during the incumbancy of the contract period it comes in the notice of the department, that the contractor or his representative is malpracticing or involves in the misutilization of the system then his contract can
The bid notice states null
The bid notice states he final payment will be made to the contractor on the basis of the overall lowest statement as worked out in the final stage.
The bid notice states after the completion of work in case any damage occurs within one year then the cost of repair will be beard by contractor/agency/coop lc society during this period
The bid notice states he final payment will be made to the contractor on the basis of the overall lowest statement as worked out in the final stage.
The bid notice states agency/firm/company participating in tenders should have pan number.
The bid notice states if any of the pump set will remain unoperated for more than 48 hrs. , the salary of pump operator will be deducted accordingly.
The bid notice states null
The bid notice states null
The bid notice states null
The bid notice states estimate amount may increase or decreased as per final vetting amount of estimates.