The tender is for the construction of concrete roads. Bidders must submit bids online through the e-procurement portal. The last date for bid submission is 15102025. The prequalification documents are to be uploaded in two separate folders. The technical bids will be opened on 17102025. The financial bid of the technically qualified bidders will be opened for evaluation. The earnest money is 2% of the estimated cost of construction or **** lakhs whichever is lower. The security deposit will be released to the contractor after the defect liability period.
The bid notice states that the time allowed for completion of work will be measured from the date of issue of work order.
GST, cess, taxes and duties etc. if any at applicable rates will be deducted from the bill of the contractor.
The security deposit money of successful bidders will be released full or in part during/after expiry of defect liability period from the actual date of completion of the work as per norms stated in other instruction, instruction to bidder itb.
The financial bid of the technically qualified bidders will be opened for evaluation.
The applicant in the same style as prime contractor should have successfully completed at least one contract of similar nature of work at least 40 value of the proposed contract within the last 5 years from date of publication of this nit or of 2two similar nature of work, each of minimum value of 30 of the estimated amount put to tender during last 5 year prior to issuance of this nit.
The contractor shall make the same good at his own expense, or in default, the engineerincharge may cause the same to be made good by other workmen and deduct the expense of which the certificate of theengineer incharge shall be final and binding on all concerned from any sums, whether under this contract or otherwise, that may be then, or at any timethereafter become due to the contractor from the government or from hissecurity deposit.
The intending bidders should satisfy himself about the alignment of the proposed road site and other site conditionby visiting the site before quoting their rates.
The results of the technical evaluation shall be made public on eprocurement systems following which there will be a period of 24 hrs during which any bidder may submit complaint which shall be considered for resolution before opening the financial bid.
The amount of earnest money is 2 of the estimated cost of construction or **** lakhs whichever is lower.