The Puducherry Slum Clearance Board is inviting online percentage rate bids for urgent repair works to the tenement block a1 at karaikovilpathu, karaikal. The closing time for submission of the etender is **** at **** a. m. The date and time of opening of the etender is **** at 4. 00 p. m. The time allowed for carrying out the work is 6 six months including the monsoon period. The contractor shall submit etender tender processing and emd fees on or before the closing date and time for submission of tender through online by internet banking neftrtgs modes only. The bid document consisting of plans, specifications, the schedule of quantities of various types of items to be executed and the set of terms and conditions of the contract to be complied with and other necessary documents can be seen and downloaded from website https:pudutenders. gov. in at free of cost. The contractor after purchasing the valid ikey and digital signature certificate can only be able to download the press notice, nit and other related documents and upload the bid document online by verifying the tender number assigned for this work from https:pudutenders. gov. in. Contractorsfirms other than those registered with pwd, puducherry should produce documentary evidence in support of their having satisfactorily completed three similar works each of 40 of estimate cost put to tender or two works each of 60 of estimate cost put to tender or one work of 80 of estimate cost put to tender in the last seven years ending previous day of last date of submission of tenders. Similar work means execution of repair works. The value of executed works shall be brought to current costing level by enhancing the actual value of work at simple rate of 7 per annum calculated from the date of completion to last date of receipt of applications for tender. The contractor shall submit the tender schedule online before the scheduled time of submission. The executive engineer, puducherry slum clearance board reserves the right to reject any or all the tenders without assigning any reason thereof. For tender related queries contact the executive engineer, puducherry slum clearance board. For any technical related queries about bidding online, please 24x7 help desk number ****, ****, 01206277787. The contractor whose bid is accepted will be required to furnish performance guarantee at specified percentage of the tendered amount mentioned in schedulee and within the period specified in schedule f. This guarantee shall be in the form of insurance surety bonds, account payee demand draft, fixed deposit receipt or bank guarantee from any of the commercial bank in accordance with the prescribed form. The contractor shall also furnish either copy of applicable licenses registrations or proof of applying for obtaining labour licenses, registration with epfo, esic and bocw welfare board and programme chart time and progress within time specified in schedulef including provident fund code no. if applicable and also ensure the compliance of aforesaid provisions by the sub contractors, if any engaged by the contractor for the said work within the period specified in schedulef. The contractor shall not be permitted to bid for works in the puducherry slum clearance board in case of contractors of horticulturenursery category responsible for award and execution of contracts, in which his near relative is posted a divisional accountant or as an officer in any capacity between the grades of superintending engineer and junior engineer both inclusive. The bid for the works shall remain open for acceptance for a period of 90 ninety days from the due date of its opening in case of single bid system. The performance of the contractor will be evaluated by the superintending engineer, pwd and report will be sent to the chief engineer periodically to assess the progress of work, workmanship, quality of work etc. based on the performance, score will be awarded to the ongoing work and
The time allowed for carrying out the work will be 6 six months including monsoon period from the date of start as defined in schedulef or from the first date of handing over of the site, whichever is later, in accordance with the phasing, if any, indicated in the bid documents.
All equipments shall be guaranteed for a period of 12months, from the date of taking over the installation by the department, against unsatisfactory performance andor break down due to defective design, workmanship or material.
The contractor whose bid is accepted will be required to furnish performance guarantee at specified percentage of the tendered amount mentioned in schedulee and within the period specified in schedule f.
Contractorsfirms other than those registered with pwd, puducherry should produce documentary evidence in support of their having satisfactorily completed three similar works each of 40 of estimate cost put to tender or two works each of 60 of estimate cost put to tender or one work of 80 of estimate cost put to tender in the last seven years ending previous day of last date of submission of tenders.
The intending bidders are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting their bids as to the nature of the ground and sub soil so far as is practicable, the form and nature of the site, the means of access to the site, the accommodation they may require and in general shall themselves obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid.
The estimated cost put to tender has been worked out by taking **** applicable for karaikal region and addendum psr ****.