INDIA | MP | JHINGURDA
Northern Coalfields Limited- Jhingurda Project
Annual charges for maintenance of Air conditioning system in Komatsu **** Dozer **** i. e. T- **** working at Jhingurda Project for a period of 01 year.
AI helper
The contractor shall stand guarantee to ensure proper cooling of operator cabin of mentioned Komatsu make equipment i. e. temperature within the range of 19c to 25c during the period of contract of 01 year from the date of issue of work order or actual start of work whichever is later. The contractor shall stand guarantee to ensure proper cooling of operator cabin of mentioned Komatsu make equipment i. e. temperature within the range of 19c to 25c during the period of contract of 01 year from the date of issue of work order or actual start of work whichever is later.
Bidders must have an average annual financial turnover during the last 3 three years ending 31st march of the previous financial year should be at least 30 of the estimated cost put to tender. average annual financial turnover during the last 3 three years ending 31st march of the previous financial year should be at least 30 of the estimated cost put to tender.
In case of breakdown of equipment more than one month, no payment will be made during that month. in case breakdown of equipment more than one month, no payment will be made during that month.
The bidder, at the bidders own responsibilities, cost and risk, is encouraged to visit and examine the site of works and its surrounding, approach road, soil condition, investigation report, existing works, if any, connected to the tendered work, drawings connected to the work, if as available and obtain all information that may be necessary for preparing the bid and entering into a contract for execution of the works. The bidder, at the bidders own responsibilities, cost and risk, is encouraged to visit and examine the site of works and its surrounding, approach road, soil condition, investigation report, existing works, if any, connected to the tendered work, drawings connected to the work, if as available and obtain all information that may be necessary for preparing the bid and entering into a contract for execution of the works.
If the l1 bidder fails to submit requisite documents online as per nit or if any of the information declaration furnished by the l1 bidder online is found to be wrong by the tender committee during evaluation of scanned documents uploaded by the bidder, which changes the eligibility status of the bidder, then his bid shall be rejected and emd of l1 bidder shall be forfeited and then the tender shall be cancelled and retendered with the same or different quantity, as per the instant requirement. in case the l1 bidder fails to submit requisite documents online as per nit or if any of the information declaration furnished by the l1 bidder online is found to be wrong by the tender committee during evaluation of scanned documents uploaded by the bidder, which changes the eligibility status of the bidder, then his bid shall be rejected and emd of l1 bidder shall be forfeited and then the tender shall be cancelled and retendered with the same or different quantity, as per the instant requirement.
The estimated cost of money is **** cost of money description of work location work including gst completion in rs. in rs. in days annual charges for maintenance of air conditioning system in komatsu **** dozer sl. no. jhingurda project within 365 **** **** **** **** working at onsite days jhingurda project for a period of 01 year.
Tender Close Date: