Deptt. Of Watershed Dev. And Soil Conservation- Ceo- Slna Cum Director- Pm- Wcdc And Se( Lr)- Executive Engineer ( Lr)
ContRetaining wall cumbuilt rectangular spillway( 2) 50Mtr, River bank PT wall cum check dam( 6) 50Mtr, Retaining wall cum curved spillway( 3) 50Mtr, Step gabion river bank protection wall( 3) 50Mtr, CC spilway/Drop structure( 3) Step gabion Spur( 12) 30Mtr baran
Tender Close Date: