S/O 3 Electrician, 3 Electrician Helper through contractor for 1 year.
AI helper
The tender is for the hiring of an electrician and helper through a contractor for one year. Bidders must register on eproc. punjab. gov. in and have a Class 3 digital signature. The last date for document submission is January 17, 2026, at 5:00 PM. The technical bid will open on January 19, 2026, at 10:00 AM. The financial bid will open on January 19, 2026, at 12:00 PM. The tender requires an earnest money deposit (EMD) and a tender form fee. The tender validity is 180 days. GST, income tax, EPF, and other taxes will be deducted from the contractor's bill. The contractor must upload a PAN card, GST registration number, ESI number certificate, and EPF number certificate. The work will be executed by the contractor in accordance with the provisions contained in form MW4 and as per Punjab PWD specifications/MORTH specifications as per agreements and the final payment will be made to the contractor on the basis of the overall lowest statement as worked out in the final stage. The contractor must submit a self-declaration that they are not blacklisted. The contractor must install a board at the site with the name of the works, estimated cost, specifications, time limit, name of the contractor, and the name of the engineer in charge along with their telephone numbers. The contractor must produce a certificate from the manufacturer that interlocking paver blocks for the specified/allotted work have been supplied by him and the grade of the paver blocks is per **** paver blocks should be ISI marked. The contractor shall have to submit his work done bill for payment. Payment for supply of materials shall only be made after verification of original bills and testing reports. In concrete works, only ready mix concrete will be allowed within a 40 km range. Test reports from approved labs will be submitted by the contractorsociety before the bill. All the works will be completed within the stipulated time as per mentioned in the NIT. If the contractor will not do so then the penalty will be charged as per the department/govt. instructions. Regarding the supply of electric material, the bidder should be an authorized dealer of Surya, Crompton, Phillips, Bajaj, etc. The cable should be ISI branded. The payment of work done will be made only after receiving the test report from NABL-approved labs/engineering colleges/govt. laboratories. Nothing will be paid extra for test reports to the contractor/society. The labour and construction society will deposit the earnest money as per the govt. guidelines/department instructions. The contractor/firm/society is bound to help the technical as well as financial audit teams. Sampling is a must for the materials used in the construction from the approved labs from N. A. B. L. The contractor/firm/society has to install a board at the site with the name of the works, estimated cost, specifications, time limit, name of the contractor, and the name of the engineer in charge along with his/her telephone numbers. All documents attached by the contractor/firm/society, including the resolution, should be signed by an authorized signatory. The technical bid requires proof of enlistment as a contractor/agency/coop LC society registered with the state government department, boards, or corporations as a civil contractor/mechanical/electrical contractor/road works contractor. Revalidation of new enlistment must be uploaded as per government guidelines. A copy of the authorized signatory must be enclosed in the case of firms and cooperative LC societies. A copy of the PAN card is required. A copy of the GST number is required. A copy of the EPF number certificate is required. A copy of the ESI number certificate is required. The contractor/firm/agency/coop LC society must submit a latest self-declaration that they are not blacklisted by any government department or any other agency until the publication of the tender notice, duly signed with the date. The permanent address and email address of the co-op.
Payment for supply of materials shall only be made after verification of original bills and testing reports Payment for supply of materials shall only be made after verification of original bills and testing reports
After the completion of work, in case any damage occurs within three years then the cost of repair will be beard by contractor/agency. after the completion of work, in case any damage occurs within three years then the cost of repair will be beard by contractor/agency.
The final payment will be made to the contractor on the basis of the overall lowest statement as worked out in the final stage. he final payment will be made to the contractor on the basis of the overall lowest statement as worked out in the final stage.
The tenderer must be enlisted with the municipal council nagar panchayat or with any other govt. department as civil contractor/building contractor/road works contractor. he tenderer must be enlisted with the municipal council nagar panchayat or with any other govt. department as civil contractor/building contractor/road works contractor.
If the contractor will not complete the work within the stipulated time, then the penalty will be charged as per the department/govt. instructions. if the contractor will not do so then the penalty will be charged as per the department/govt. instructions.
Sampling is must for the materials used in the construction from the approved labs from N. A. B. L. sampling is must for the materials used in the construction from the approved labs from n. a. b. l.
The estimated value is INR 11,04,****. ender value in inr 11, 04, 000