02/09/2026 - INDIA | TN | TIRUCHIRAPPALLI
Bharat Heavy Electricals Limited- Bhel Trichy- Valves/ Sub- Contracting
Dispute Resolution
****
subcontracting valves
AI helper
The items are to be delivered within the contractual delivery duration as per the table from the last date of issue of raw materials, and items delivered beyond the contractual delivery duration are liable for liquidated damages. items are to be delivered within contractual delivery duration as per the below table from the last date of issue of raw materials.
For non-MSE bidders, payment is made on the 90th day from the date of material acceptance, while for MSE bidders, it's on the 45th day, and for medium enterprises, it's on the 60th day. i for non msme bidders: 100 payment on 90th day from the date of material acceptance against submission of billing documents as mentioned in sl. no. 10 ii for mse bidders: 100 payment on 45th day from the date of material acceptance against submission of billing documents as mentioned in sl. no. 10. iii for medium enterprises bidders: 100 payment on 60th day from the date of material acceptance against submission of billing documents as mentioned in sl. no. 10.
The bidder warrants that the finished products comply with the drawings and technical conditions, and if found defective, the vendor will repair or rework the items free of cost. he bidder shall warrant that the finished products comply fully with the drawings and other technical conditions specified by bhel. if the finished products are found defective owing to faulty workmanship incomplete work at any time until end user acceptance, the vendor shall do the necessary repair rework the defective items free of cost.
BHEL reserves the right to negotiate with the L1 vendor, and in case of a tie, revised reduced price offers will be obtained to finalize the L1 rate. bhel reserves the right to negotiate with the l1 vendor, if required. 1. 4 in case of tie in the lowest l1 vendor for the same item, revised reduced price offer will be obtained in closed cover from the tied l1 vendors to finalize l1 rate before negotiation.
The bidder would be required to register with a valid DSC on the eprocurement portal for submitting their bids. he bidder would be required to register with valid dsc on the above eprocurement portal for submitting their bids.
Items delivered beyond the contractual delivery duration are liable for liquidated damages at a rate of 0. 5% of the pending purchase order value per week of delay, up to a maximum of 10% of the total purchase order value. items delivered beyond contractual delivery duration from the last date of issue of raw material are liable for liquidated damages at the rate of 0. 5 of the pending purchase order value per each delayed week or part thereof for a maximum of 10 of total purchase order value pv.
Offers cannot be submitted after the specified time. offers cannot be submitted after the specified time.
Tender Close Date: