The tender is for railing and platform repairing and painting of a drill machine. The bid submission end date is 20251016. The bid opening date is 20251017. The work location is Samleswari OCP, pincode 768225. The estimated value is 158937. 00. The bid validity is 120 days and the period of work is 7 days.
The works should be completed within the time stipulated in the contract work order. The work shall, throughout the stipulated period of contract, be carried out with all due diligence on the part of the contractor.
Running on account billbills for the work executed materials supplied in accordance with the work order contract shall be prepared on the basis of detailed measurements recorded as described hereinbefore and processed for payments. Payment of on account bill shall be made on the engineerincharges certifying the sum to which the contractor is considered entitled by way of interim payment for the following:
The employer will award the contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has offered the lowest evaluated acceptable bid price, provided that such bidder has been determined to be: a. eligible in accordance with the provisions of clause 2 and b. qualified in accordance with the provisions of clause **** to clause 25, the employer will award the contract to the bidder whose bid has been determined to be substantially responsive to the bidding documents and who has offered the lowest evaluated acceptable bid price, provided that such bidder has been determined to be: a. eligible in accordance with the provisions of clause 2 and b. qualified in accordance with the provisions of clause 3.
The bidders shall be required to submit bid with all the information as sought online along with required documents as detailed in etender notice. 3. 1 the bidders shall be required to submit bid with all the information as sought online along with required documents as detailed in etender notice. the qualification eligibility criteria is detailed in etender notice.
If the contractor fails to complete the work and clear the site on or before the date of completion or extended date of completion, he shall without prejudice to any other right or remedy available under the law to the company on account of such breach, pay as compensation liquidated damages: i @half percent of the contract amountrevised contract amount whichever is less, perweek of delay. 6. 2 if the contractor fails to complete the work and clear the site on or before the date of completion or extended date of completion, he shall without prejudice to any other right or remedy available under the law to the company on account of such breach, pay as compensation liquidated damages: i @half percent of the contract amountrevised contract amount whichever is less, perweek of delay.
The bidder, at the bidders own responsibility, cost and risk, is encouraged to visit and examine the site of works and its surroundings, approach road, soil condition, investigation report, existing works, if any, connected to the tendered work, drawings connected to the work, if as available and obtain all information that may be necessary for preparing the bid and entering into a contract for execution of the works. 6. 1 the bidder, at the bidders own responsibility, cost and risk, is encouraged to visit and examine the site of works and its surroundings, approach road, soil condition, investigation report, existing works, if any, connected to the tendered work, drawings connected to the work, if as available and obtain all information that may be necessary for preparing the bid and entering into a contract for execution of the works.
The contractor shall immediately after the award of work draw up a schedule giving dates for submission of samples as required or necessary as per the specification for approval of engineerincharge who shall approve, if found acceptable, promptly so that there is no delayin the progress of the work of the contractor or of the work of any of the subcontractor. 8. 4 the contractor shall immediately after the award of work draw up a schedule giving dates for submission of samples as required or necessary as per the specification for approval of engineerincharge who shall approve, if found acceptable, promptly so that there is no delayin the progress of the work of the contractor or of the work of any of the subcontractor.
The clarification end date is **** end date **** 05: 00 pm
The estimated value is ****. ender value in inr 1, 58, 937